Like most projects, there are always a lot of moving pieces specifically when working in a delicate environment like a hospital. In this specific job, construction would take place right on top of a cardiac unit that had several labs- all required to keep functioning during the construction. “You’re working in an existing operating hospital. The more you can keep construction out of that hospital, the better you are. Our whole logistic plan was geared around that idea.”